The BOM lives in a spreadsheet
Component lists are maintained separately from the item catalogue, so a change in one is a silent divergence from the other.
Work orders against a bill of materials, run on defined production lines, with quality control results held against the output — not in a separate quality folder.
Five tools · Consumes Inventory stock · Feeds Finance with real cost
Illustrative product view with sample data. Request a live walkthrough.
Production planning built on a stock figure from another system is planning on a rumour.
Component lists are maintained separately from the item catalogue, so a change in one is a silent divergence from the other.
Material is drawn for a job and stock is corrected later, which means neither the job cost nor the stock figure is right in between.
The inspection record exists, but linking it back to what was produced and from which lot is a manual exercise.
Small and focused by design — it uses the item catalogue, the stock records and the people the rest of the platform already holds.
A job with its material, its line and its status, drawing from the same warehouse records as everything else.
BOM components are catalogue items, so availability is a fact rather than an assumption.
Define the lines you run and see what is scheduled on each.
Inspection results attached to what was produced and the lot it came from.
Every step touches records other modules already own.
Focused on the manufacturing operations of industrial and fabrication businesses.
Current production state — orders in progress, line load, output and quality results in one view.
Production jobs with quantity, dates, assigned line and the components they consume from stock.
Component structures built from the shared item catalogue, so availability reflects the real warehouse.
The lines or cells you actually run, with what is scheduled on each and how loaded they are.
Inspection and test results recorded against the work order and traceable to the lot used.
Which is exactly why it works better inside the ERP than beside it.
Issuing material to a work order is a stock movement, so the warehouse figure and the job cost move together.
The machines on a production line are assets with preventive plans, so planned downtime is visible to the planner.
Material consumed is material recorded, so the cost of a job is built from movements rather than estimated.
Planner, supervisor and inspector, working from one record.
Releases work orders knowing whether the components are on the shelf and whether the line has capacity.
Runs the day from the work order list, records progress, and sees planned maintenance before it interrupts a run.
Records results against the work order and the lot, so traceability is a query rather than an archaeology project.
Fabrication, assembly and batch production need different shapes. This is configuration, not customisation.
| Setting | Value |
|---|---|
| Production lines | 4 active |
| Component shortage | Warn on release |
| QC before stock | Required |
| Work order statuses | Custom (6) |
| Backflush material | On completion |